Verified client work · 2026

Recent plumbing projects delivered across Dehradun.

Real client work from Clock Tower to Rajpur Road — full-home fittings, renovations, booster pumps and pressure fixes. Every job written-quoted, pressure-tested and handed over with warranty.

20+
washrooms delivered in 2026
6+
new-home full plumbing jobs
100%
pressure-tested handovers
60-day
workmanship warranty

Case studies

7 recent Doon Plumber projects — client, area & scope.

Every project below was delivered by our in-house team with written quotes, brand-original fittings and pressure testing before handover.

01
Project #1 · 2026

Full Kitchen & Master Washroom Renovation — Clock Tower, Dehradun

Mr. Manish JainClock Tower, Dehradun 9 working days

End-to-end kitchen and washroom renovation in the heart of Clock Tower. Old GI lines were replaced with concealed CPVC, drains re-slopped, and new Jaquar mixers, showers and health faucets installed with 60-day warranty.

Scope of work
  • Complete kitchen plumbing rework (sink, RO line, drain)
  • Master washroom demolition & rebuild
  • Concealed CPVC piping with brand-original fittings
  • Jaquar sanitaryware installation & pressure testing
Outcome: Zero leaks on pressure test · handed over 1 day ahead of schedule.
02
Project #2 · 2026

New Home Plumbing — 6 Washrooms + 2 Kitchens · IT Park, Dehradun

Mr. Rahul AroraIT Park, Dehradun 22 working days

Complete plumbing execution for a new duplex near IT Park — from slab-stage first-fix piping to final sanitaryware. Every joint pressure-tested at 5 kg/cm² before wall closure.

Scope of work
  • First-fix plumbing for 6 washrooms & 2 kitchens
  • Concealed hot & cold CPVC lines
  • PVC drain & waste stack with vent piping
  • Overhead tank, motor & pressure booster integration
  • Second-fix sanitaryware and geyser connections
Outcome: All 6 washrooms & 2 kitchens commissioned leak-free on first flush.
03
Project #3 · 2026

Luxury Villa Plumbing — 10 Washrooms + 4 Kitchens · MDDA Dalanwala

Mr. Satish AgarwalDalanwala, Dehradun 34 working days

One of our largest residential projects of the year — a 10-washroom, 4-kitchen villa in the MDDA Dalanwala scheme. Delivered with dual-line hot water, softener bypass, and pressure-boosted upper floors.

Scope of work
  • First-fix plumbing across 3 floors
  • 10 washrooms + 4 kitchens with concealed CPVC
  • Twin overhead tanks with independent risers
  • Sewer chamber, gully traps & rainwater harvesting stub
  • Premium Jaquar / Kohler sanitaryware second-fix
Outcome: Balanced pressure on every floor · handed over with as-built drawings.
04
Project #4 · 2026

Whole-House Low Water Pressure Fix — Jakhan, Dehradun

Mr. Shubham AgrawalJakhan, Dehradun 1 day

Taps across the house were running slow. We ran an outlet-by-outlet pressure survey, identified an undersized riser plus clogged strainers, upgraded the line and added a small booster pump.

Scope of work
  • Diagnostic pressure survey on every outlet
  • Cleared clogged strainers & angle valves
  • Replaced undersized riser with 25 mm CPVC
  • Installed inline pressure booster
Outcome: Flow rate improved from 3 LPM to 11 LPM at the master shower.
05
Project #5 · 2026

Booster Pressure Pump Installation — GMS Road, Dehradun

Mr. Amit PandeyGMS Road, Dehradun 1 day

Installed an automatic booster pressure pump on the incoming line to solve weak flow on the upper floor. Included dry-run protection and a neatly wired MCB panel.

Scope of work
  • Site survey & pump sizing
  • Automatic pressure booster with dry-run protection
  • Suction & delivery piping with NRV
  • Panel wiring and float-switch tuning
Outcome: Consistent 1.8 bar pressure across every tap and shower.
06
Project #6 · 2026

3-Washroom Renovation + Booster Pump + Tank Cleaning — Rajpur Road

Mr. Aayush RawatRajpur Road, Dehradun 14 working days

Combined project on Rajpur Road — three washrooms fully renovated, a booster pump added for consistent pressure, and both water tanks cleaned and disinfected before handover.

Scope of work
  • 3 washroom demolition & full rebuild
  • Concealed CPVC hot/cold lines with insulated hot risers
  • Premium sanitaryware & shower panels
  • Booster pressure pump installation
  • Overhead & underground water tank cleaning + disinfection
Outcome: Bathrooms handed over with 60-day workmanship warranty · water potability confirmed.
07
Project #7 · 2026

Whole-House Plumbing & Pressure Health Check — Canal Road, Dehradun

Col. Rajeev MaithaniCanal Road, Dehradun Same-day

A full preventive plumbing check for a serving officer's residence — every outlet tested, valves serviced, and a written report handed over with prioritised recommendations.

Scope of work
  • Room-by-room plumbing inspection
  • Pressure & flow testing at every outlet
  • Valve, strainer & flush-tank servicing
  • Written health-check report with recommendations
Outcome: Two silent leaks caught early · estimated ₹18,000 saved in future damage.

Your project could be next.

Renovation, new-home fitting, booster pump, tank cleaning or a same-day pressure fix — we quote in writing, work clean, and warranty every joint.

Serving all Dehradun · 200+ localities covered · 4.9★ from 327+ reviews

Call Now+91 74174 01286 Call Now+91 74091 19323